Free tool

Finish & coverage estimator

Work out how much finish to buy, how many coats to apply, what grit to sand between them, and how long each coat needs to dry at your temperature and humidity.

The workpiece

Edges, mouldings, turned parts.

The finish

Shop conditions

20 °C
55 %
Buy this much finish
0.00 litres

Solvent finishes are a fire risk

Oil-based stain and polyurethane are flammable, and rags soaked in them can self-ignite. Work with cross-ventilation, wear nitrile gloves and a respirator, and store used rags submerged in water inside a sealed metal container.

Reference

Typical coverage rates and coat schedules

FinishCoverageCoatsRecoat timeSand betweenBefore use
Penetrating oil12 m²/L24–6 h2203 days
Water-based lacquer10 m²/L31–2 h3203 days
Oil-based polyurethane14 m²/L34–6 h3207 days
Paste wax16 m²/L220–30 min40024 hours
Marine varnish11 m²/L4–612–24 h2807 days

Coverage varies with how much the wood absorbs and how thickly you apply each coat. The first coat always takes more than the label figure suggests.

Finishing notes

Three things that decide how the job looks

Prepare, then prepare again

Most finish faults are sanding faults. Step through the grits, vacuum between every grit change, and take the last pass with a tack cloth. A dust nib you can see before finishing becomes a lump you can feel afterwards.

Respect the recoat time

Applying the second coat while the first is still soft traps solvent and produces a wrinkly film that never fully hardens. If in doubt, wait longer — the finish does the material no harm by waiting.

Thin coats beat thick ones

Three thin coats outlast two heavy ones every time. Thick coats stay soft, run on vertical surfaces and take far longer to cure through. The only place a heavier first coat helps is when the wood is very porous.